
‘Balancing Power’: In this photo shared by State DIPR, Electrical department staff from the Tening division, Peren, is seen replacing a punctured disc on the 33 kV line between Nkialwa and Mbaulwa on October 17. Balancing high in the air without any safety apparatus, they are steadying the grid. (DIPR Photo/X)