
DIMAPUR, APRIL 3 (MExN): The Power Department has informed all consumers catering power supply from Metha and Forest Sub-station in Dimapur that there will be power shut down from April 4 to 9 from 2:00 am to 8:00 am, as the department is taking up dismantling and shifting works of old existing HT and LT lines to newly erected Trunk Line in parts of Dimapur town area. A press release from the department asked all consumers in the affected areas to extend cooperation and bear with the inconvenience during the shutdown period.