Zunheboto, September 12 (MExN): The Power Department has informed that power supply in and around Zunheboto, Satakha and Aghunato blocks will be disrupted from September 14 to November 15, to allow utility shifting works of the 33kV composite line along Chakhabama-Zunheboto road. In this regard, Executive Engineer of Zunheboto Electrical Division Shilu Lkr issued a press release informing that power supply will be disrupted occasionally from 8:00 am to 5:00 pm during this period. All consumers in the affected areas are requested to extend cooperation and bear the inconvenience during the shutdown period, the engineer appealed.