Chümoukedima resolves to halt drainage work within its area

Ward in Chümoukedima resolves to halt drainage work within its area

Ward in Chümoukedima resolves to halt drainage work within its area

A view of the ongoing work of NH-29 four-lane construction in Chümoukedima area. (Morung File Photo)

 

Expresses dissatisfaction over the concrete work of the drainage system

 

Chümoukedima, February 11 (MExN): The leaders of Chümoukedima Town Ward-2 have resolved to put a halt on further progress of the ongoing work of 4-Lane cum drainage construction in its area. 


This was resolved at an emergency meeting held on February 10 with regard to the ongoing work after spot verification and thorough examination of the area.


As per a press release appended by the Chairman and the GB of Ward 2, the members were not satisfied with the concrete work of the drainage system. It resolved to put a halt on the work “until the side engineer come to the spot to have joint verification with the colony leaders,” the release said.


Noting loopholes in the “quality of work,” it held that under no circumstance shall the quality of work be compromised.


“The concerned firm is hereby notified through mass media to stop drainage work with immediate effect till the matter is finally amicably settled,” it stated.