
Maligaon, March 14 (MExN): The NF Railways today informed that about 600 stations have been indentified for improved facilities, which will be assigned to Indian Railway Station Development Corporation Limited (IRSDC) shortly. However, as a parallel measure, it has been decided to develop about 70 stations through Zonal Railways separately including 5 stations of NF. Railway-Katihar, Lumding, Tinsukia, Alipurduar & Rangiya. The emphasis will be on having a visible change in the station without unnecessary construction all over. Divisional Railway Managers have been directed to appoint Architectural consultant for preparation of overall architectural plan. They may also take feedback and ideas from local stakeholders. These works on the identified stations will be completed by December, 2018 and the scope/quantum of work will be planned keeping the target in mind. The items covered under this include a vast array of features ranging from improving the facade of the station building, improvement of rooms, way points, seating facilities, ticketing improvements, parking, garbage disposal facilities etc.